We are

Eugen Bader
Diplom Ingenieur (FH) in process and environmental engineering

Born in: 1979

Education: Degree in process and environmental engineering at the Heilbronn University of Applied Sciences, including an internship at Symyx Technologies Santa Clara-CA, USA

Language skills: English, Russian

Professional experience:
Since 2011: Tiede-&Niemann Ingenieurgesellschaft mbH, Hamburg
2005 – 2010: Project engineer at Steinbeis-Transferzentrum Verfahrens-, Energie- und Umwelttechnik, Heilbronn

Main projects:

  • Assessment and optimization of scrubbers for cruise ships, Primarine GmbH
  • Planning of a heat transfer system using thermal oil
  • Planning support for Stadtreinigung Hamburg in the construction of a resource and energy centre for the Hamburg EfW and bioenergy facilities
  • Feasibility study on heat recovery and raising temperature by means of a thermal pump for the waste incineration plant Kiel
  • Calculation of pressure losses in the exhaust-gas system upstream the scrubber, ERC Technik GmbH
  • Basic engineering EGCS in the marine sector, ERC Technik GmbH
  • Planning and implementation of a tank system for landfill leachate, AVG Köln
  • Enhancement of electrostatic precipitator, AVG Hamburg
  • Basic engineering SCR-plant, Delfzijl, The Nethetherlands
  • Study on the optimization of the flue-gas cleaning system, AVG Hamburg
  • Planning of a heat exchanger for pre-heating the flue gas upstream the SCR catalyst, MV Kiel
  • Feasibility study for the construction of a new steam turbine, BSR Berlin
  • Planning and implementation of a vapour scrubber, MVA Bielefeld
  • Planning and implementation of an aqueous ammonia injection system, MVA Bielefeld
  • R1-calculations for MVA Hagen, MVA Hamm and MHKW Ruhleben
  • Planning and implementation of a reducing station, AMK Iserlohn
  • Study on heat recovery upstream the scrubber, SRH
  • Assessment of the catalyst for denoxing, MHKW Ruhleben
  • Planning and implementation of system recycling the wastewater in the scrubbers, VERA Hamburg
  • Renewal of flue-gas cleaning system in the sewage sludge incineration plant, Berliner Wasserbetriebe
  • Optimization of ash loading system, VERA Hamburg
  • Study on heat recovery from waste steam for greenhouses, ZAS Burgkirchen
  • Planning and implementation of aqueous ammonia tank, MAK Rostock
  • Planning work for solar power plant in Doem-Bang, Thailand
  • Calculations for packed-bed scrubber to optimize operation, MVA Bielefeld